Snake S-Curve Graphic Tee

Snake S-Curve Graphic Tee

Sand / S
CHF 25.99
Skip to product information
Snake S-Curve Graphic Tee

Snake S-Curve Graphic Tee

CHF 25.99
Renk
To you
S M L XL 2XL 3XL 4XL 5XL
Width, cm 45.72 50.80 55.88 60.96 66.04 71.12 76.20 81.28
Length, cm 71.12 73.66 76.20 78.74 81.28 83.82 86.36 88.90
Sleeve length (from center back), cm 38.35 41.91 45.72 49.53 53.34 56.90 60.20 63.50
Size tolerance, cm 3.81 3.81 3.81 3.81 3.81 3.81 3.81 3.81
Lightweight, quietly bold, and strangely graceful — this tee wears like a trusted companion. The subtle serpent curl printed on a clean white canvas feels minimal yet evocative: part nature study, part whispered rebellion. It settles into weekend routines, trail mornings, and late-night coffee runs. Wear it under an open shirt or alone; the soft, structured cotton keeps the silhouette relaxed without sagging. For people who notice small details and prefer calm, thoughtful statements over loud logos, this shirt becomes a small declaration — curious, composed, and a little wild.

Product features
- 100% cotton (solid colors) — medium weight 180 g/m² for year-round comfort
- Tubular knit (no side seams) for cleaner lines and reduced fabric waste
- Ribbed knit collar and shoulder tape to keep shape and prevent stretching
- Dual printing: DTF for sleeves and inner label; DTG for main design ensures crisp detail
- Tear-away label, Oeko-Tex certified, made in Nicaragua with ethical US cotton sourcing

Care instructions
- Non-chlorine: bleach as needed
- Do not iron
- Do not dryclean
- Machine wash: cold (max 30C or 90F)
- Tumble dry: low heat


EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Gildan 5000, 2 year warranty in EU and Northern Ireland as per Directive 1999/44/EC

Warnings, Hazard: For adults, Made in Nicaragua

Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: low heat, Do not iron, Do not dryclean

You may also like